If the traverse had 12 occupied stations, what is the order of the traverse accuracy level?

Prepare for the Geodetic Engineer Board Exam. Enhance your knowledge with comprehensive questions, hints, and detailed explanations. Achieve success on your first attempt!

In the context of geodetic surveying, traverses are categorized based on the number of occupied stations and the corresponding accuracy level. The greater the number of occupied stations in a traverse, the higher the potential accuracy of the survey.

For a traverse with 12 occupied stations, it is classified as a first-order traverse. First-order traverses are characterized by their high accuracy and reliability, as they typically involve careful measurement techniques and equipment that allow for very precise data collection and results. The accuracy levels are set by geodetic standards, where first-order measurements are expected to achieve high precision, making it suitable for projects that require detailed and stringent accuracy.

In contrast, traverses with fewer occupied stations, such as those classified as second, third, or fourth order, would exhibit lower precision and are used for different scopes of work where extreme accuracy may not be as critical. Each subsequent order would indicate a decrease in the stringency of the measurements and could be related to less rigorous standards or equipment.

Therefore, the classification of a traverse with 12 occupied stations as first order reflects the expectation of high-quality, accurate survey results.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy